Production-Grade Risk Management.
Built for Your IT Team.

Replace spreadsheets with a self-hosted application. NIST, ISO 27001, CIS, and SOC 2 aligned out of the box.

🔒 Self-Hosted
✅ NIST CSF 2.0
🔐 ISO 27001
📊 SOC 2 Type II

Why IT Teams Love It

Purpose-built for small and mid-size IT organizations that need control, visibility, and compliance alignment.

🛡️

Complete Control

Self-hosted means your risk data never leaves your infrastructure. No vendor lock-in. No SaaS surprises.

📊

Real-Time Visibility

Interactive dashboards, heat maps, and risk trend analysis. See what matters in seconds, not spreadsheet edits.

📎

Evidence Collection

Attach documents, screenshots, and audit logs. Build an immutable evidence trail for compliance reviews.

🔍

Audit Ready

Every change is logged. Every risk is versioned. Export to Excel for auditor handoff in seconds.

🚀

Fast Setup

Docker Compose deployment in 5 minutes. Bare metal installer for air-gapped environments. No dependencies.

🔑

Built-In Auth

Local authentication, OAuth2, SAML SSO. Multi-factor authentication support. Role-based access control.

Compliance Frameworks Included

Pre-mapped and ready to go. No manual framework alignment needed.

🏛️ NIST CSF 2.0

All six functions mapped: GV, ID, PR, DE, RS, RC. Enterprise-grade risk categorization.

🔒 ISO/IEC 27001:2022

Annex A control alignment. Perfect for ISO certification and audit preparation.

📋 CIS Controls v8

All 18 controls mapped. Prioritize what matters most to your organization.

🎯 NIST SP 800-53

Control family references for federal compliance and defense contractors.

✅ SOC 2 Type II

Trust Services Criteria alignment. Demonstrate control effectiveness to auditors.

See It In Action

Explore our live demo. No signup required.

Live Demo Available Now

Browse a pre-loaded risk register with 10 representative IT risks. Explore the dashboard with heat maps and risk distribution charts, dive into individual risks with detailed scoring and evidence attachments, and see how the audit trail captures every change.

Access the demo:

No signup required. Browse read-only access to experience the full interface and capabilities.

Launch Demo →

What You'll See in the Demo

  • Risk Dashboard: Heat maps, distribution by level (Critical/High/Medium/Low), risks by IT domain
  • Risk Register: 10 sample risks with full details, priorities, owners, and review dates
  • Risk Details: Deep dive into individual risks with inherent/residual scoring, control mappings, evidence attachments
  • Evidence Trail: See how documents and supporting materials are attached and versioned
  • Export Ready: See how risks can be exported to Excel for auditors

How It Works

From spreadsheet chaos to production-grade risk management.

1️⃣

Deploy Anywhere

Docker: Run in production in 5 minutes with Docker Compose. Bare Metal: Self-contained installer for air-gapped environments. Your Infrastructure: No vendor dependencies.

2️⃣

Enter Risks Quickly

Use our intuitive form to capture risks across 32 fields. Auto-calculate risk scores. Align to frameworks automatically. Attach evidence in seconds.

3️⃣

Monitor & Audit

Real-time dashboards show your risk landscape. Immutable audit trail tracks every change. Export to Excel for compliance reviews. Schedule reviews and track progress.

Interested? Let's Talk

See the live demo first, then let's discuss how this fits your organization's risk management needs.